Purpose

This is the final design review in the engineering capstone design course. You will be demonstrating you complete working system in its final form. Your functional specification will be used as the standard by which your project is judged. You will also turn in your complete test document including final results of all tests.

Preparation

Complete Project

Your project should be complete before the design review begins. This means:

bullet

All systems are working standalone (no emulator systems or external boards)

bullet

All parts fit in their case - no parts or external connections other than those listed in the specification documents

bullet

All software is complete, tested, and debugged

bullet

UI is complete and complies with specs

bullet

Hardware and software meet all specifications

Essentially, your project must be complete and "ready to ship."

Test Results

You will turn in your complete test results by 11AM on the day of the review. These should provide evidence that the project is truly complete.

Documentation

Your team should have turned in the following documents by 11AM on the day of the review:

  1. Test Plan with Results

No schedule is needed because everything is finished. :-)

Grading

Category Percentage of score
All functions are completely working and integrated together. 50
Project is standalone. 15
Project is in final enclosure 10
All tests have been completed and reported. 10
All tests have been passed. 15

Kevin Bolding September 22, 2009