SPU EE Senior Design
2002-2003

Fall Quarter - EE 4211

Date Topic Assignments Due
Oct. 1 Introduction
Design methodology (PowerPoint presentation)
Project ideas
 
Oct. 8 Functional specification (PowerPoint presentation)
Formal team assignments
Design notebooks
(due Monday): Team assignment requests
Oct. 15 Microcontroller Choices (PowerPoint Presentation)
Interfaces (PowerPoint presentation)
 
Oct. 22 Design Review 1.1 - Basic design, functional specification, and schedule Notebook (due 9AM): Design matrix, Block diagram, Schedule, Functional Spec
Oct. 29 Power supplies  (PowerPoint presentation)
Part selection
 
Nov. 5 Team presentation 1.1 - Design Decisions  
Nov. 12 Working with your development system, Eagle  
Nov. 19 Design Review 1.2 - Parts list, Schematic Notebook (due 9AM): Parts list/Cost estimate, Schematic, Updated schedule
Nov. 26 Software Architecture (PowerPoint presentation)  
Dec. 3 Team presentation 1.2 - Interfaces, Parts, and Schematic  
Dec. 10 Design review 1.3 - Fully loaded and wired prototype with working power supply, software architecture Notebook (due 9AM): Software Architecture Document, Updated schedule

Winter Quarter - EE 4212

Date Topic Assignments Due
Jan. 7 Writing device drivers. Power Supply Characterization.  
Jan. 14 Hardware debugging Schedule for winter quarter
Jan. 21 Mechanical design  
Jan. 28 Design review 2.1 - Basic device drivers, power supply. Due at 9AM: Power supply characterization.
Device driver specification.
Feb. 4 Presentation 2.1 - Power supply, Device drivers, Vector board.   
Feb. 11 Using Eagle for PCB design.
Planning a good design review (Steve O'Hara, Fluke Networks).
Discussion of YWMTG ch. 1 and 2.
Read ch. 1 and 2 of YWMTG.
Feb. 18 Design review 2.2 - All device drivers, two main functions, mechanical spec. Due at 9AM: Mechanical specification.
Complete schematic in Eagle.
Feb. 25 Presentation 2.2 - Mechanical spec, Software functions.  
Mar. 4 Case study - The Electronic Flight Information System (Nick Bogner, Paul Dunscomb, Bryce Shoeber - Dynon Development)
Discussion of YWMTG ch. 3 and 4.
Read ch. 3 and 4 of YWMTG.
Mar. 11 Design review 2.3 - All main software functions running independently, PCB complete. Due at 9AM: Updated software architecture document, PCB specification and complete PCB design.

Spring Quarter - EE 4213

Date Topic Notebook Entries Due
April 1 Getting your PCB up and working  
April 8 Design review 3.1 - Test plan, PCB startup, All major functions working on PCB-based system Schedule for spring quarter
Test Plan
 
April 15 Functional testing.
Discussion of YWMTG ch. 5-8.
Vocation paper 1
Read ch. 5-8 of YWMTG.
April 22 Design review 3.2 - Complete debugged standalone product (Everything complete).
 
Functional test results

 
April 29 Discussion of YWMTG ch. 9, 10,11
 
Vocation paper 2
Read ch. 9,10,11 of YWMTG.
May 6 Discussion of YWMTG ch. 12. Vocation paper 3
Read ch. 12 of YWMTG.
May 13 Patents and other Legal Issues
Discussion of YWMTG ch. 15, 16
Vocation paper 4
Read ch. 15, 16 of YWMTG.
May 20 Choices in vocation - Priest or Nun. Guest speaker, Pope John Paul II. Vocation paper 5
May 27 Final Presentations and Ultimate Frisbee Tournament 
Note: At Safeco Field - Open to the public!
CFE Senior Report Completed
Team Posters